Back to Projects
CASE STUDY 07

Nyabihu Mill Project

LOCATIONNyabihu District, RW
YEAR2023
CATEGORYInstitutional
Nyabihu Mill Project
Click to View Full Size
LAT: 1.621° S

PROJECT STATEMENT

A sustainable agro-industrial facility uniting a volcanic stone administrative gatehouse with energy-efficient ventilated production sheds.

The Nyabihu Mill Project reinterprets industrial architecture in Rwanda's Western Province by uniting local stone craftsmanship with high-efficiency industrial design. The entrance complex features a volcanic stone administrative gatehouse with slatted timber accents, providing a dignified public threshold.

Behind it, the main milling and storage facility features insulated corrugated cladding in regional forest tones, punctuated by vertical translucent daylighting strips and passive ridge ventilators that maintain comfortable indoor temperatures without mechanical cooling.

Nyabihu Mill Project Detail
Expand
Nyabihu Mill Project Interior
Expand

SPECIFICATIONS

Total Area2,800 m²
ConstructionVolcanic Stone Gatehouse, Structural Steel Frames & Insulated Metal Cladding
ClientNyabihu Agricultural Processing Union

Document Ref: ST-07-2026

VISUALIZATION & STUDIES

3D Volumetric Studies

Hover to reveal color • Click to expand
Administrative Stone Pavilion
Full Color
01 / Administrative Stone PavilionVIEW FULLSCREEN ↗
Passive Ridge Ventilation Shed
Full Color
02 / Passive Ridge Ventilation ShedVIEW FULLSCREEN ↗
Industrial Logistics Circulation
Full Color
03 / Industrial Logistics CirculationVIEW FULLSCREEN ↗
SITE PLAN

Geographical Context

An agro-industrial milling plant strategically located in Rwanda's Western Province. The architecture combines a welcoming volcanic stone administrative pavilion with optimized logistics corridors and natural ridge ventilators for zero-energy cooling.

BUILDING MASS
SCALE: 1:500N ↑LAT: 1.621° S
“Form follows function — that has been misunderstood. Form and function should be one, joined in a spiritual union.”
— Frank Lloyd Wright